Description
Summary:
The Planner/Scheduler ensures project timelines for steel fabrication, erection, and finishing are met by planning, monitoring, and coordinating resources across all project phases.
Highlights:
1. Critical role in project planning, monitoring, and control
2. Focus on steel fabrication, erection, and finishing activities
3. Utilizes Primavera P6 and MS Project for scheduling
Planner/Scheduler plays a critical role in planning, monitoring, and controlling project timelines, ensuring steel fabrication, erection, and finishing activities are executed on schedule while coordinating resources across engineering, procurement, and site execution.
**Core Responsibilities**
* Develop and maintain project schedules using Primavera P6, MS Project, or similar tools.
* Create baseline schedules covering design, procurement, fabrication, delivery, erection, and finishing.
* Prepare lookahead schedules (30\-day, 90\-day) aligned with site progress and material availability.
* Monitor fabrication and erection progress against milestones; update schedules with actual data.
* Identify delays and variances; perform time\-impact analysis (TIA) and propose recovery plans.
* Coordinate with stakeholders (project managers, engineers, subcontractors, and suppliers).
* Integrate schedules with cost control and resource planning to support earned value management (EVM).
* Ensure compliance with contractual requirements and client reporting standards.
**Required Skills \& Competencies**
Technical Skills
* Proficiency in Primavera P6, MS Project, Excel.
* Knowledge of Critical Path Method (CPM) and resource\-loaded scheduling.
* Ability to interpret PEB fabrication drawings, erection sequences, and BOQ data.
* Familiarity with procurement cycles, logistics, and site erection workflows
**Education \& Experience**
* Education: Bachelor’s degree in mechanical engineering .
* Experience: 08\+ in construction scheduling, preferably with steel/PEB projects.
* Certifications: Planning \& Scheduling Professional (PSP – AACE), Primavera P6 certification
**Risks \& Challenges in PEB Scheduling**
* Fabrication delays due to shop drawing approvals or material shortages.
* Logistics bottlenecks in transporting steel frames to site.
* Erection sequence conflicts if cranes or manpower are not aligned.
* Weather impacts (wind, rain) affecting steel erection safety and timelines.
* Coordination gaps between design, procurement, and site execution.
Work Location: In person